Release
OVQ / 10 · Pepper Construction - I-69 Bridge Rehabilitation
Bar List Printed- Control code
- OVQ
- Release #
- 10
- Job
- CCR6937
- Customer
- Pepper Construction
- Coating
- Black + epoxy
- Tons
- 15.3 tons
- Remaining
- 15.3 tons
- Status
- Bar List Printed
- Description
- Superstructure
- Black / epoxy
- 15,250 lbs / 15,250 lbs
- Created (listed)
- 06/20/26
- Tags printed
- -
- Released to shop
- –
- Original requested
- 11/21/26
- Requested
- 11/28/26
- Confirmed
- GC confirmed
- Shipped
- -
- Days in shop
- -
- GC note
- -
- Ready to ship
- No
- Load(s)
- -
- Last modified
- J. Burke · Sep 26, 10:00 AM ET
Total: 6
| #3 | Black | 80 | 5,083 lbs | 2.5 tons |
| #4 | Black | A706 | 5,083 lbs | 2.5 tons |
| #5 | Black | 60 | 5,084 lbs | 2.5 tons |
| #3 | Epoxy | 80 | 5,083 lbs | 2.5 tons |
| #4 | Epoxy | A706 | 5,083 lbs | 2.5 tons |
| #5 | Epoxy | 60 | 5,084 lbs | 2.5 tons |