Release
GTT / 5 · Pepper Construction - I-69 Bridge Rehabilitation
Bar List Printed- Control code
- GTT
- Release #
- 5
- Job
- CCR6937
- Customer
- Pepper Construction
- Coating
- Black + epoxy
- Tons
- 8.2 tons
- Remaining
- 8.2 tons
- Status
- Bar List Printed
- Description
- Superstructure
- Black / epoxy
- 8,150 lbs / 8,150 lbs
- Created (listed)
- 09/25/26
- Tags printed
- -
- Released to shop
- –
- Original requested
- 01/22/27
- Requested
- 01/22/27
- Confirmed
- GC confirmed
- Shipped
- -
- Days in shop
- -
- GC note
- -
- Ready to ship
- No
- Load(s)
- -
- Last modified
- J. Burke · Oct 11, 10:00 AM ET
Total: 6
| #18 | Black | 80 | 2,716 lbs | 1.4 tons |
| #3 | Black | A706 | 2,716 lbs | 1.4 tons |
| #4 | Black | 60 | 2,718 lbs | 1.4 tons |
| #18 | Epoxy | 80 | 2,716 lbs | 1.4 tons |
| #3 | Epoxy | A706 | 2,716 lbs | 1.4 tons |
| #4 | Epoxy | 60 | 2,718 lbs | 1.4 tons |